1. This site is being certified for the following uses:
Land    Industrial Building   Office Building
yes   no   no
2. This certified site's primary uses include:
Light Manufacturing  Heavy Manufacturing Distribution Office Commercial
yes no yes yes no
3. Address
Site Name Light Industrial 30 acres; adjacent 20 acres with
Street 1800 West 200 South
City
County Millard
State Utah
Zip Code 84631
Web Site N/A
4. Broker or in house information:
Name Tony Fuller
Company ADF Holdings, LC
Address 151 North 4600 West
City Fillmore
State, Zip Utah, 84631
Phone 435-743-6877
Cell 435-979-0271
Fax 435-743-5834
Email tfuller42@frontiernet.net
Web Site N/A
5. General site description
30 acres raw, unspoiled land, 990 ft frontage on SR 100. 20 acres adjacent (with an existing well) also available from same owner, if a larger parcel is needed. Water rights already permitted in the well (avaible at additional cost).
6. Acreage
Available Acreage 50
Maximum Possible Contiguous Acreage 50.00
Minimum Possible Contiguous Acreage 20.00
7. Building Characteristics
Total Square Footage 0
Min Industrial square footage 0
Max Industrial square footage 0
Min Office square footage 0
Max Office square footage 0
Classification of office space
Type of construction
Year built N/A
Ceiling height (industrial only) N/A
Number of dock-high doors (industrial only) N/A
Number of ground-level doors (industrial only) N/A
Number of parking stalls N/A
8. Sale and lease information
Total Sale Price $60,000
Sale Price Per Acre $2,000
Sale Price Valid Current
Lease Price Per Acre not available
Minimum Lease Term (years) n/a
9. Is the site currently served by, or immediately adjacent to, a commercial rail line? no
If yes, fill out the following table
Main Line Provider
Short Line Provider
Siding Available
Spur Available
Train Frequency to Site
If no, fill out the following table
Distance to Nearest Line (miles) 35 (at Delta, Utah)
Nearest Intermodal Facility (miles) 120 (Provo, Utah)
10. Are telecommunications services available at the site? yes
If yes, fill out the following table.
  Frontier Crystal Peaks
T1 Available Yes No
T3 Available No No
Fiber Available No along SR 100
Wireless Available No Yes
If no, fill out the following table.
Type of service closest to site
Distance from site (miles)
Anticipated timeline to get service to site
11. Are electric services available at the site? yes
If yes, fill out the following table.
Service provider Flowell Electric REA
Local utility representative (name, phone, email) Durand Robison, 435 743 6214
Describe service location at site near well
Does the site have redundant power supply  No
Transformer size (KVA) Unknown
Single-phase Yes
Three-phase available
Existing power lines on site? Yes
Existing power lines adjacent to site? Yes
Distance to nearest substation (miles) 4
If no, fill out the following table.
Type of service closest to site
Distance from site (miles)
Anticipated timeline to get service to site
12. Is natural gas service available at the site? yes
If yes, fill out the following table.
Provider Questar Gas
Local utility representative (name, phone, email) Brad Simons, 801-324-5802, bsimons@questar.com
Line Size at Site (inch)
Location on Site
If no, fill out the following table.
Type of service closest to site 6" HP on 400 North (1/4 mile)
Distance from site (miles) adjacent
Anticipated timeline to get service to site Short time frame due to locatio of HP & IHP
13. Is sewer service available at the site? no
If yes, fill out the following table.
Service Provider Millard County
Local utility representative (name, phone, email) (no service available)
Line Size at Site (inch)
Location on Site
Pretreatment Available
If no, fill out the following table.
Type of service closest to site Municipal (Fillmore)
Distance from site (miles) 1.5
Anticipated timeline to get service to site Unknown
14. Is water service available at the site? no
If yes, fill out the following table.
Service Provider
Local utility representative (name, phone, email)
Line Size at Site (inch)
Location on Site
If no, fill out the following table.
Type of service closest to site Private well
Distance from site (miles) adjacent
Anticipated timeline to get service to site install a pump
15. Solid waste service at site
ProviderMillard County
Distance from Site to Landfill (miles)1 mile
16. Has an Environmental Phase 1 assessment been conducted?no
Fill out the following chronology of previous site land uses
DateUse
1852-presentBrush Pasture
17.Additional environmental studies
DateStudy Type
None
18.Are there any wetlands on the site?no
If yes, has a delineation study been conducted? NA
19. Air quality
Attainment / Non-Attainment AreaAttainment
EPA Class 1 Area(s) Near SiteNone
20. Has a geo-technical assessment been conducted on the site?no
If no, fill out the following table
USGS Soil ClassificationN/A
Known Groundwater Depth (feet)N/A
Design Wind Speed (mph)N/A
Design Ground Snow Load (lbs)N/A
Percent SlopeN/A
Direction of SlopeN/A
USGS Mean Elevation (feet)5,135
Known Geologic ConstraintsNone Known
21. Current site zoning
ZoningPermitted Uses
Light Industrialmultiple
22. Does the site currently have any restrictive covenants or conditional uses?no
23. Are copies of the owner’s letter of intent to sell or lease available? yes
24. Has a preliminary title report been run? no
25. Available state incentives
Incentive Available at Site Maximum Award Use of Funds Criteria
Training Incentive (CFT) Yes, by application $250 per employee match Hard training expenses Wage, FTE Status
Training Incentive (CFT) Yes, by application $250 per employee match Hard training expenses Wage, FTE Status
EDTIF (Economic Development Tax Increment Financing) Yes, by application 30% of state tax liability for 10 years Unrestricted Wage, Urban/Rural Location, # of Jobs
IAF (Industrial Assistance Fund) Yes, by application Typical award is between $1,500 and $2,500 per new job created Unrestricted Wage, Urban/Rural Location, # of Jobs
Recycling Availability Varies 5% income tax credit Unrestricted Equipment purchased must be qualified recycling purshase
Energy Development Zones Yes, by application Varies Manufacturing Equipment and Buildings Firm must generate energy from renewable resources or manufacture parts that go directly into renewable enegy development
IRB (Industrial Revenue Bond) Yes, by application $10,000,000 tax free bond Manufacturing Equipment and Buildings Firm must be small issue manufacturer as defined by IRS
The above table is a list of available incentives. No incentive can be guaranteed until an application has been submitted and the appropriate body has rendered a decision. Please contact EDCUTAH for additional information.
26. Available local incentives
Incentive Available at Site Maximum Award Use of Funds Criteria
Enterprise Zone Yes Up to $2,000 in income tax credit per job or $75,000 in income tax credit based on capital expenditure Unrestricted Must locate in a county of less than 50,000 people and a city of less than 10,000. Industry restrictions apply.
RDA (TIF) Possible Varies Varies Salary, number of jobs & capital investment
EDA (TIF) Possible Varies Varies Salary, number of jobs & capital investment
CDA (TIF) Possible Varies Varies Salary, number of jobs & capital investment
Revolving Loan No
New Market Tax Credit Not Eligible
27. County wage survey – positions based on site's highest and best use
Position Median Hourly Wage Estimate as of:
Electrical Power Line Installer  $30.25 June - 10
Education Administrators, Elementary and Postsec. $36.62 June - 10
First Line Supv/Mgr Production and Oper. Workers  $19.34 June - 10
Eligibility Interviewers, Government Programs  $19.16 June - 10
Laborers, Freight, Stock, Material Movers $10.08 June - 10
28. Surrounding major employers - area of economic influence
Name Industry Number of Employees Miles from Site
Great Lakes Cheese  Manufacturing  181 7
Intermountain Power Service  Electricity Production  490 32
Millard County Government  138 3.4
Millard County School District Education  290 28
Brush Wellman Manufacturing/Distribution  99 47.8
29. Recent company expansions – area of economic influence (major events, last 3 years)
Company Date # Of Jobs Reason (if known)
LiquaDry 2009 5 mkt. growh
30. Recent company contractions – area of economic influence (major events, last 3 years)
Company Date # Of Jobs Reason (if known)
None
31. Recent company relocations – area of economic influence (major events, last 3 years)
Company Date # Of Jobs Reason (if known)
First Wind 2008 - 2009 8-10 Renewable Energy
Magnum Gas Storage 2009 5 Natural Gas Storage
32. Community introduction - include points of unique, historic or scenic interest and any positive or negative qualities
Fillmore City is home of the first Territorial State House of Utah. Millard County is rich in natural resources in mining and renewable energy (Wind, Solar & Geothermal). See www.millardcounty-ecdev.com and www.millardcountytravel.com
33. Residential real estate costs
  Price
Median Home Price 136,000
Median Rental Price (monthly) $ 600
34. Government contacts
Entity Name Title Email Phone
State Jeff Edwards President of EDCUTAH jedwards@edcutah.org 801-328-8824
County Linda Gillmor Dir, Bus & Econ Dev lcgillmor@co.millard.ut.us 435-864-1407
City Gene Larsen Mayor secretary@fillmorecity.org 435-743-5233
35. Natural disasters – 75 mile radius
  Year # Of Incidents Location Relative to Site Damage Assessment
Flood None
Tornado None
Hail Storm None
Earthquake None
Wildfire June - 05 1 34 miles Unknown
36. Taxes
Property Tax Rate 1.0520%
Individual Income Tax Rate (max) 5.35%
Corporate Income Tax Rate 5.0%
Combined State and Local Sales Tax Rate 5.95%
37. Primary and secondary education – 75 mile radius
School District(s) Millard, Juab, Sevier
Number of High School Graduates 199
Graduation Rate 99%
Available Private Schools 2
Estimate as of: July - 09
38. Vocational and two-year colleges – 75 mile radius
Name Snow College, Richfield
Graduates 118
Areas of Focus Business, Mechanics, Machinery, Nursing 
Estimate as of: July - 09
Name Delta Technical Center
Graduates NA
Areas of Focus technical training
Estimate as of: July - 09
39. Four-year colleges – 75 mile radius
Name Utah State University, Delta Campus Dist. Ed.
Enrollment 47
Graduates 3
Estimate as of: July - 09
Name
Enrollment
Graduates
Estimate as of:
40. Public Safety
Distance to Nearest Hospital 1 Mile
Distance to Nearest Fire Station 1.5 Miles
Distance to Nearest Police/Sherriff Station 1 Mile
41. Site population and workforce information
  Within 30 miles Within 50 miles Within 75 miles
Total Population 14,801 42,903 74,904
Population 25-64 6,572 19,950 33,782
Total Labor Force 7,468 17,646 27,800
Estimate as of: May - 10
42. Unemployment rate (unadjusted) and job creation
Geography Rate Estimate as of:
State 7.2% June - 10
County 6% June - 10
Job Creation by County -3.1% (-123) 2009
43. Nearest road transportation
  Name Distance (miles)
North-South Interstate I-15 2.5
East-West Interstate I-70 35
44. Distances to
  Name Distance (miles) Direction
Closest Frontrunner Commuter Rail Station None
Closest TRAX Light Rail Station None
Large River or Body of Water Yuba Lake 35 North
Waste Water Treatment Facility NA
45. Distances to
Major Western Markets Distance (miles) Direction
Salt Lake City 150 North
Denver 508 East
Phoenix 513 South
Las Vegas 279 Southwest
Los Angeles 543 Southwest
San Francisco 843 West
46. Freight carriers
Number of Local Trucking Companies 7
47. Air transportation – international
Name Distance Daily Flights Major Markets Major Carriers
SLC International Airport 154 Miles 700 CHI, LAX, NYC, SFO Delta, United, Southwest
48. Air transportation – regional and private service
Name Distance Daily Flights Markets Carriers
Fillmore Municipal Airport 3.5 Miles Charter Private
49. SURE Sites application prepared by:
Name Tony Fuller
Address 151 North 4600 West
City Fillmore
State, Zip Utah, 84631
Phone 4357436877
Cell 4359790271
Fax 4357435834
Email tfuller42@frontiernet.net
Web Site
50. Economic development contact
Name Linda Gillmor
Company Millard County
Address 71 S 200 W / PO Box 517
City Delta
State, Zip UT, 84624
Phone 435-864-1407
Cell N/A
Fax 435-864-1404
Email lcgillmor@co.millard.ut.us
Web Site www.millardcounty-ecdev.com
51. Date of Qualification
Initial Qualification June - 09
Updated June - 10